CAPINTELLIGENCE
Data-driven. Field-proven.

CAP·PATH · The Capital Project Management Platform  +  CAP·CORE · The Capital Project Management System

Plan the portfolio. Run every project. Keep what you learn.

CAP·PATH is the software your capital program runs on, from the five-year plan down to the person who owns one deliverable this week. The gated work process is its spine. Around that spine it carries the portfolio and its cash by year, the scoping requests that bring projects in, the governance forums and their gate decisions, the risk register, every open action, and the lessons that make the next project better. CAP·CORE is the best-practice standard it deploys.

Own the standard. Run it in software.

Project boardIllustrative
H-207 Convection section replacement
StandardStage P4 · toward G4, 31 days
P1P2P3P4P5P6P7
CostSchedule · exchanger delivery vs tie-in window

Sanctioned at G3 · control estimate $12.60M
Rides the 2027 turnaround window · T0 pinned
Recorded gate decisions · append-only audit

The problem · where most owner programs are today

The program is bigger than the project. Most software is not.

Sites run forty projects on one budget cycle with tools that see neither end: the capital plan lives in a spreadsheet, the gate process lives in a binder, the decisions live in minutes nobody reopens, and the lessons live in whoever happened to be there. Four failures hide in that gap.

A plan nobody can defend
A wish list with a total at the bottom

Seventy rows, a number on each, a color for whether it is going ahead. Nobody can say why a project is funded, which ones ride the same window, or what happens to the year when that window moves.

A standard on a shelf
The gate process lives in a document, not in the work

A binder does not assign the deliverable, date it from the gate, or hold the gate until the accountable person decides on the record. Big projects tolerate it; small ones route around it.

Governance without a record
Gates cleared in a room and lost in the minutes

Steering meets, decides, and moves on. Six months later nobody can say what was decided, who decided it, or whether the recycled deliverables ever came back.

Lessons that evaporate
The register opens at closeout, when memory is already gone

A project runs two years; a lessons meeting at the end reconstructs it from fading memory. Actions get minuted, filed, and rediscovered as the same surprise next project.


Plan the portfolio · before any of this

The capital plan, built as a model rather than a spreadsheet.

Every project at every site on one timeline, gate to gate, with the turnaround windows they ride. Cost by year with the grant and internal split, cash by month from your own finance export, the standing obligations of the portfolio on a calendar, and a candidate list fed by scoping requests rather than hallway asks. Your existing forecast is imported as it stands, so the first view is your list, not a blank page.

Covered in depth on its own one-pager

The Capital Portfolio

What the year really carries once the turnaround and the projects pinned to it are stacked, which candidates earned their place, and the monthly forecast every project owes.

Timeline, gate to gate, with the windowsCost by year, planned against original against actualMonthly cash forecasting with the finance round tripTerms of Reference lead times by tier, on a calendar

What it does

One system, from the scoping request to the post-investment review.

It governs what happens, when, who owns it, and what gets approved, then carries the decisions, risks, actions, cash, and lessons that grow around it. The detailed engineering and the construction schedule stay with your engineers and planners.

01

Bring projects in the front door

A project enters through a scoping request the disciplines review before anyone sees a row on the plan.

One-page scoping request

Anyone can raise one: what you saw and where, why it matters, whether it needs a turnaround window. It routes through the sections your template names, each with a named discipline owner, a lead time, and the option to say not applicable.

A portfolio decision, recorded

When every section is decided, the site’s deciders record one outcome: accept with a stage, class, budget year, sponsor, and project manager; defer to a date; or decline with a reason. Accepting creates the project on the plan.

Tiered before it is deployed

The complexity calculator scores seven factors and recommends the tier. Nothing is saved until the deploy dialog runs it for real, so it is safe to try on a hypothetical project.

02

Run the project

The work process, deployed to a real project with a real team on it, and held to.

Own the standard

Your work process is a versioned template your company controls. Start from the CAP·CORE master, import the gate process you already run, or build one, then edit every activity, role, gate, and offset. No change requests to alter your own standard.

Deploy by tier, anchored to the gates

The tier decides which activities deploy. The front end back-calculates from the sanction gate, and on a coupled project from the earlier of the window start and the scope freeze; execution runs forward from the field start. Conditional tracks switch on only when true of the project.

Coached on the step, accountable at the close

The governing standard, what good looks like, and the date the gate needs it by sit on the step itself. Every activity has a named responsible and a named accountable. A key deliverable keeps the record behind it, closes only on the accountable person’s acceptance against its acceptance test, and a gate closes only through a recorded decision: proceed, recycle, hold, or cancel.

Two lamps on every project

Cost and schedule each carry an Andon lamp. Yellow is an open rated risk against a milestone or the budget. Red is a recorded impact. A lamp is raised, never switched off; it clears when the record behind it closes.

Improve the standard

The Drift report shows exactly how a running project diverged from its template, every re-lay included. Promote a change worth keeping into a new version of the company standard in one step.

Report and notify

Weekly and monthly reports computed live from the data date and frozen as numbered PDFs on schedule. Rollups by role, person, and phase; export to Excel; event-driven email that chases for you.

03

Govern it

The forums that actually steer a capital program, run as a system rather than a calendar invite.

Portfolio body, steering, gate meetings

The portfolio governance body is a monthly series seeded from your own work process, with the portfolio report on its agenda. Steering forums and gate meetings are recurring series with a question-form agenda and a context dashboard built from live data.

Minutes people trust

Record the room if you want to, and the transcript drafts the minutes. Decisions, actions, and risks are proposed, never assumed: the facilitator accepts, edits, or dismisses each one. Approval freezes the minutes and sends them out.

The gate decision is the record

A gate meeting records its decision as one object bound to the gate row: outcome, conditions, the re-review date on a recycle, who chaired it. The project sponsor chairs the funding gates G1 to G3; the steering chair takes the delivery gates G4 to G6. Superseding a decision requires naming its replacement, so the register can never quietly contradict itself.

04

Manage what threatens it

An evergreen register with the heartbeat enforced, contingency by estimate class, and cash forecast monthly.

Your matrix, your language

Scoring runs on your own risk matrix, uploaded as it exists today. Risks are written as cause, uncertain event, and effect, filed under the phase they belong to, and the coach helps shape a vague one rather than refusing to save it.

The heartbeat is the product

Every risk has one named owner and a review-by date keyed to its severity. Mitigations are real actions in the same spine. A risk that reaches its date untreated forces a recorded acceptance; gates hold for a register pass; a rated risk against a milestone lights the lamp.

Cash forecast, every month

Each project owes a monthly estimate at completion and a note on what moved. Cash by month is entered on the project or imported for every active project from your finance export, matched in a preview before anything commits. Late forecasts escalate.

05

Learn from it

The half of lessons learned that everybody skips: capture during, not after.

Thirty seconds, from anywhere

One box, on the activity you are standing on, typed or spoken. The project, phase, and category fill themselves in. Attributed by default, anonymous when it needs to be.

It comes back where it was learned

A lesson resurfaces on the next project’s copy of the same activity, in front of the person about to do that job. When a lesson echoes one never actioned, the platform says so.

Actions that land in the plan

One action spine: gate conditions, meeting commitments, lessons actions, readiness tasks. One named owner. Re-dating needs a recorded reason. Verified is its own state, and the owner cannot verify their own action.

06

Ride the turnaround window

Most capital at a running plant either rides a window or has to stay out of one. The link is a first-class object, not a note.

Linked from either side

A project links to the turnaround it executes in, ties into, depends on, or shares scope with. The turnaround manager sees the projects riding their window; the project manager sees the window. One record, two doors, one sign-in.

Pinned, so a moved window moves the project

A project in a window pins its field start to the window’s start. When the turnaround moves, the project re-lays and the revision says why. The front end is back-calculated from the scope freeze, because the tie-ins must be defined before the freeze, not before the outage.

On the same portfolio

Turnaround cost and project cost stack on one year-by-year view, with linked projects drawn attached to their window. Overlapping preparation windows and the people they share are named before they collide.


Run · the deployed project

From template to a dated, accountable plan in one click.

The complexity calculator scores the project and recommends the tier. PATH copies your template, lays every activity out from the gates and the field start, and opens the board: named owners, ready-to-start flags, the two lamps. The site team owns its copy, and improvements promote back into the company standard. No vendor change requests.

The accountability rail

On the step
The standard
Responsible
Build it
Kept
The record behind it
Accountable
Acceptance
Recorded
Gate decision
The standard, what good looks like, and the due date sit on the step itself. The deliverable and its basis are kept as evidence, nothing closes without the accountable person’s acceptance against its acceptance test, and a gate closes only through a recorded proceed, recycle, hold, or cancel. Every step lands in an append‑only audit trail.

Ask the platform

The standard, answering questions.

A standard nobody reads is a binder with a login. Every person on the project can ask the platform what a deliverable has to contain, why a gate exists, what an estimate class commits them to, or what their own role owns this month, and get an answer grounded in two things only: your governing standard and your deployed plan.

It is the fastest way a new project manager gets useful, and the reason your standard stops being a document people mean to read.

Where the boundary sits

  • It cites the standard. Every substantive answer names the governing document it came from, so the person can go and read it.
  • It reads your plan, not the template. Dates, owners, and sequence come from your deployed project, drift included.
  • It coaches, it never decides. It will not approve, score, gate, or judge readiness. Asked whether a package is good enough for sanction, it explains what the standard expects and points at the accountable approver by name.
  • It says when it does not know. If the standard and the plan do not cover the question, it says so and points at who can answer, rather than inventing a requirement.

Keeping it alive

One brief a week, not a notification habit.

A process only survives if people are reminded of it at the right frequency, and gets abandoned if they are reminded too often. Everyone gets one brief a week: what moved across their projects, and what is theirs in the week ahead. Only approvals waiting, a forecast owed, and anything overdue interrupt the day.


The standard it runs on · CAP·CORE

You own the standard, not a black box.

CAP·CORE is the documented best-practice owner’s system PATH deploys: forty-seven standards from governance and portfolio through front-end definition, planning, execution, commissioning, and closeout, plus the delivery profiles for control-system and business-system projects, and a tiered work process of 156 activities at Major and 16 at replacement in kind. Built on public-framework rigor and tailored to how your site actually works. The master ships in the tool; copy it, adapt it, and make it yours. Or import the gate process you already run and keep your house standard, now live and enforced.

GVGovernance & portfolio FEFront-end definition PLPlanning & readiness EXExecution & construction SUCommissioning & startup CLCloseout & improvement DPDelivery profiles
Major
Above about $20M

Every gate, full document set, independent review mandatory at sanction.

Standard
About $5M to $20M

The full gate structure with condensed deliverables.

Small
Under about $5M

Combined definition, weeks of front end, a desk review ahead of sanction.

RIK
Like for like, any value

One combined gate, standard templates, the change screen and the safety review never skipped.

CAP·CORE Standard

License the management system and its tiered work process, tailored to your sites, nomenclature, funding sources, and approval ladder. Every requirement classed as an interlock, a core practice, or a stretch, so tailoring is honest rather than silent.

CAP·CORE Adoption

A hands-on engagement to stand the system up and make it stick: load the portfolio, deploy the work process on the live projects, set the gate calendar and the accountability, seed the portfolio forum, and coach your people to run it without us.

At a glance

47
standards in the Capital Project Management System, yours to tailor
156
activities in the master work process at Major; 16 at replacement in kind
4
tiers, Major to RIK, scored by a seven-factor calculator
3+3
funding gates G1 to G3, delivery gates G4 to G6, four outcomes and a record at every one

Built on public frameworks (AACE, CII front-end planning practice, PMI, DCMA, and GAO) · tailored to your site, never a shrink-wrapped download


Why us

Process conformance and independent assurance, on one project record.

CAP·PATH runs on the same spine as our assurance reviews, and as the sister platform for turnarounds, so the state of the work process, an independent read of the package, and the window the project rides sit on one record, not in three disconnected systems. That is the seam no closed tool can offer.

On one record

The plan, the process, and the read on it

  • CAP·PATH runs the portfolio, the work process, the gate decisions, the risks, the cash, and the lessons.
  • CAP·AR reads readiness ahead of each gate, independently.
  • CAP·SAR works the integrated schedule before the baseline locks at sanction.
  • CAP·SPR measures the outcome and files the benchmark record.
What that unlocks

The loop the incumbents cannot close

  • The scoping request, the gate decision, the risk it was about, the action it created, the cash it moved, and the lesson that came out are one chain of records.
  • A gate’s process conformance sits beside its independent readiness score.
  • The project and the turnaround window it rides are one record with two doors.
  • You own and edit the standard, so it never becomes a vendor’s black box.

What you get

A governed portfolio, accountable projects, and a standard that improves.

In
Your standard +
your capital forecast
→
Engine
Plan, deploy,
govern, learn
→
Out
Governed portfolio +
accountable projects

The standard and the acceptance test on every activity, named accountability, key deliverables with the record behind them, recorded gate decisions with four outcomes, a decision register with revisit dates, a risk register with a review heartbeat, monthly cash forecasting, one action spine, and an append-only audit trail. The portfolio with cost by year, the scoping-request front door, the monthly portfolio report, Excel export, the coach, and one weekly brief keep the whole program moving. Your team works in the CAP·PATH client portal; we work beside you in the same system.

Deployable now, consultant-led. CAP·CORE is delivered as a tailored engagement; CAP·PATH runs it as the software you own.


What changes

The difference between a binder and a system.

Without CAP·PATH + CAP·CORE

  • ×A capital plan in a spreadsheet, defended from memory
  • ×Gates cleared on trust, deliverables closed with no evidence
  • ×Small projects routing around a ladder written for the big ones
  • ×A moved turnaround window that nobody re-lays the projects for
  • ×Lessons reconstructed at closeout, actions filed in a binder

With CAP·PATH + CAP·CORE

  • ✓A portfolio with cost by year, candidates that earned their place, and a decision record
  • ✓The standard on the step, acceptance at the close, and a recorded gate decision on every project
  • ✓Four tiers of one process, so the light track is genuinely light
  • ✓Projects pinned to their window, re-laid when it moves, with the revision recorded
  • ✓Lessons captured in-cycle that land in the next project’s plan

Your guide

We have sat in the seat, on both sides of the table.

CAP Intelligence is an independent assurance practice built from the owner’s side, across refining, petrochemicals, industrial gas, LNG, and power, as the owner accountable for the capital outcome and as the consultant brought in to protect it. It is the capital-projects practice of STO Intelligence LLC, and shares one spine with its turnaround practice.

Our methods stay at public-framework level, AACE, CII front-end planning practice, PMI, DCMA, and GAO, so every finding is defensible and nothing is a black box. You own the standard, not a proprietary score you cannot see inside.

Why CAP Intelligence

Independent Owner-side Public-framework method Refining · Petrochem · LNG · Power Veteran-owned

Empathy for the seat you are in, running a capital program on a process that lives in a binder and a few senior people’s heads. Authority to fix it: we wrote the standard, built the platform that runs it, and assure it independently on the same record.

Put your whole capital program in software you own.

Show us how you run projects today. We will stand up your standard in CAP·PATH, import your capital forecast, and walk your team through their first deployed project.