CAP·PLN · Planning, Estimating & Materials · A module of CAP·PATH, the Capital Project Management Platform
CAP·PLN turns the Level 3 schedule into construction work packages by area and discipline, plans the installation work packages a crew can finish in one rotation, reads them as the estimate at the class each gate asks for, and derives each material’s order-by date from the step it feeds. It is one build-up, so the packages, the number, and the parts cannot drift apart. The contractor’s schedule stays the schedule.
One build-up: the packages, the estimate, and the materials.
The problem
Engineering issues drawings, procurement chases materials, construction opens fronts, and the estimate was frozen at sanction from a different list. Each is managed. The seams between them are where the field hours go.
Nobody listed what the package needed before release, so the constraint is found by the foreman, at the work, on the clock.
The estimate class is declared in the gate package rather than earned from the maturity of the deliverables behind it.
The estimate assumes a productivity nobody wrote down, and the field indirects are a percentage rather than a plan.
Material dates are worked back from memory, and the engineered item that needed ten months is identified at eight.
What it does
It carries front-end and construction planning the way an owner’s team runs it: package the work face, clear its constraints, price it at the gate’s class, and order what the steps need.
Construction work packages from the schedule, and installation work packages a crew can finish.
One construction work package per area and discipline, seeded from the Level 3 schedule’s own structure and linked to the activities beneath it, so the contractor’s schedule stays the plan. It is the owner’s slice of that schedule, in the vocabulary of advanced work packaging.
Under each sits the installation work packages: one crew, one rotation, planned as steps with crew, duration, logic, crafts, and equipment. The page warns when one grows past a thousand hours, because a package a crew cannot finish is a package nobody can close.
Each package carries a dated checklist: engineering, materials, equipment, scaffold and access, permits, prerequisite packages, simultaneous operations, checksheets, vendor support, turnover documents, the safety plan. Each line has an owner and a due date. Release over an open constraint is refused unless an administrator records why.
The first tab says what the pack must contain: the issued-for-construction drawings, the specification, the material take-off, the inspection plan and checksheets, the lift plan, work-face photos. A review round of named seats sets it reviewed, never a button, and the platform builds the pack as a revisioned PDF.
The estimate is the plan read as money, at the class each gate asks for. It is not a second tool.
The AACE classes on your gate ladder, with Class 3 as the sanction estimate. Each is a dated snapshot priced through the rate table in force, with a coverage line stating what still carries no rate. Issuing writes the figure to the portfolio. The control estimate freezes at Class 2 or 1.
A deliverables register on the structure of AACE 18R-97 holds the maturity of each front-end deliverable. A class reads as achieved only when every row reaches the level that class needs, so the class on the gate slide is the class the record supports.
Each calendar states paid, productive, and scheduled hours. Field indirects, construction facilities and equipment, the owner’s team, and commissioning support are planned by day. Each contractor hands in its plan, and the estimate prices the accepted version only.
A trend is raised when it is first seen, becomes a change notice, and is approved or rejected on the record. An approved change counts in the control budget. Contingency reads from the risk register, with the owner’s confidence level beside it, and management reserve is held outside the total.
Order-by dates that come from the plan, and a long-lead list that is released first.
Lines come from the piping spec the line number names, an equipment set, or your catalogue. An exception takes a reason and an engineering signature, and release is refused while one is unsigned.
Need-by is the step’s start less your staging lead. Order-by is need-by less the lead time, with a buffer on a long-lead line. Move the plan and the dates move. A promise that lands after the step it feeds lights the lamp.
A threshold by project tier marks the long-lead lines, and they release ahead under their own number with the order-by frozen at release, so trigger dates met is a measured figure. An early buy on undecided scope asks who authorized it. Scope deferred later says cancel or hold the order.
A quote request carries one row per item, and a recorded quote prices every line that uses it. The release list goes out in your layout and carries the order into your purchasing system. Nothing is ordered here.
The inspection plan, the turnaround window, and clean files for the systems around it.
A named inspector owns the plan and issues it by revision. Quality is not planned until it is issued, every hold point sits on a step, and the hours for the examination land on that step so the planner carries them.
A package in the window takes the turnaround’s own milestones as constraints: the job pack, the materials, the pre-work. Tie-ins sit on a register the turnaround manager sees too, the turnaround’s dates govern, and a late inclusion needs the steering team’s recorded acceptance.
Packages planned here export to the scheduling tool with stable codes, and progress goes back as a file. A documented API with company keys and signed webhooks carries the same records to anything you build.
Estimate · the ladder
Open a class and the platform prices the packages’ steps through the rate table in force, adds the resource plan, and states its own coverage. The gaps are printed on the estimate rather than discovered after the gate.
Where the line sits
CAP·PLN holds the owner’s packages, prices what your team wrote, and derives dates from the schedule. The engineering, the contractor’s schedule, and the purchase order stay where they are.
What changes
How it fits
CAP·SCP (Scope Management), CAP·PLN (Planning, Estimating & Materials) and CAP·EXE (Execution & Field Quality) are one add-on to the CAP·PATH subscription, per site, and one add-on covers both the capital and the turnaround door a site holds. The gated work process, the portfolio, governance, risk, cash forecasting, lessons, the readiness indicator, and the role guides are in the base platform.
CAP·EXE takes the released packages to site: the shift look-ahead, completion by system, and progress claimed against the same steps. The cost control one-pager covers what happens to the estimate once the baseline is frozen.
We seed the construction work packages from your schedule, plan the first installation packages with your team, and show the estimate read from your own steps.